Kozhikode-Wayanad tunnel project in Keralam remains stalled despite submission of documents
Prolonged stoppage has raised concerns over safety and durability of the 110-metre stretch of tunnelling already completed in the right tube on Anakkampoyil side. KRCL and the contracting agency have reportedly warned that continued suspension could lead to deterioration of the completed work